• Soil and Rock

    2021 11 12 Soil and rock expansionor swellafter mining Soil or rock from the borrow expands when dropped on the lorry or the landfillor stockpiled One cubic from the borrow does not translate to one cubic dump Bulking or swell factors for some materials Material Density at the Borrow.

    Get Price
  • Excavation Hazards

    Excavation Hazards Affects and Prevention Measures 1 Pit Excavation up to 3m Pits up to three meters may be excavated for testing subsurface soil monitoring water table foundation construction etc There are number of hazards which may be encountered in excavations of pits up to 3m depths.

    Get Price
  • PDF

    River Bank Protection

    2013 4 12 and bank failure from mass wasting or due to positive pore pressure in stream bank Fischenich 1989 Bank Failure by Toe Scour Johnson Stypula 1993 Secondary flow hydraulics enhance bank erosion on outer banks in meander bends Kunzig 1989 2

    Get Price
  • PDF

    Chapter 6 Excavation Equipment 6

    2018 1 19 Bank Measure Volume of a Dipper For example If a 2m3 dipper excavating material whose swell is 25 will handle an average loose volume of 2.25m3 the bank measure volume will be 1.8m 3 1 0.25 2.25 Bank Measure Volume of a Dipper If this shovel can make 2.5 cycles per min the output will be Output 2.5 u 1.8 4.5m / min or 270 m3 / hour

    Get Price
  • Bulk Density

    Bulk Density Measurement Key points Bulk density is the weight of soil in a given volume Soils with a bulk density higher than 1.6 g/cm3 tend to restrict root growth Bulk density increases with compaction and tends to increase with depth Sandy soils are more prone to high bulk density Bulk density can be used to calculate soil

    Get Price
  • Soil and Rock

    2021 11 12 Soil and rock expansionor swellafter mining Soil or rock from the borrow expands when dropped on the lorry or the landfillor stockpiled One cubic from the borrow does not translate to one cubic dump Bulking or swell factors for some materials Material Density at the Borrow.

    Get Price
  • Baltic Exchange Dry Index BDI and Freight Rates

    2021 10 17 8/1/2021 Normally a container will go from the factory in Shanghai to Chicago in 35 days Currently it takes up to 73 days and then the container will go back usually empty 3/5/2021 The BDI Baltic Exchange Dry Index rose 2.8 to 1 829 The Capesize index rose 6.6 to 1 784 The Panama index rose 1.3 to f 2 241.

    Get Price
  • Excavator SIZES CHART

    2019 10 4 Excavator operator Excavator lifting capacity chart Excavator operators and slingers should be made aware of these dangers and effective communications must always be maintained between slinger and operator The excavator operator should always make use of the safety lever safety armrest whenever the slinger is in the danger area.

    Get Price
  • What are Bulk Earthworks in Construction Jurovich Perth

    by cutting into or excavating an area of ground or by constructing a new area such as an embankment by adding earth based materials to a certain location When bulk earthworks are taking place the aim is to reuse as much as possible of the excavated materials to prevent both the costly collection of waste material and the delivery of extra

    Get Price
  • Baltic Exchange Dry Index BDI and Freight Rates

    2021 10 17 8/1/2021 Normally a container will go from the factory in Shanghai to Chicago in 35 days Currently it takes up to 73 days and then the container will go back usually empty 3/5/2021 The BDI Baltic Exchange Dry Index rose 2.8 to 1 829 The Capesize index rose 6.6 to 1 784 The Panama index rose 1.3 to f 2 241.

    Get Price
  • Best Earthworks Estimating Software

    2021 11 15 Compare Learn More SharpeSoft Estimator SharpeSoft Estimator is an on premise cost estimating software for contractors and sub contractors in the construction industry Offered on a best of breed basis SharpeSoft provides integrated tools for labor and equipment costin Read more 4.50 19 reviews Compare.

    Get Price
  • Types of Excavation Used in Construction 13 Common

    2017 2 23 Rock Excavation Rock excavation is based on the removal of materials generally due to rocky surfaces that impede construction or engineering projects This type of excavation is often considered more challenging than other types and may require specialized equipment to break up and/or remove rocks before a project can proceed.

    Get Price
  • How to Calculate and Solve for Bulk Density

    2020 9 25 Therefore the bulk density is 4 Calculating the Mass of the Soil when the Bulk Density and the Volume of the Soil is Given m = s b x V Where m = Mass of the Soil s b = Bulk Density V = Volume of the Soil Let’s solve an example Find the mass of the soil when the bulk density is

    Get Price
  • Excavating Online

    2021 11 4 Bulk excavation estimatorstandard Length and depth values should be represented by feet Excavation and haul information Job name info Enter the job name Predetermined quantity cubic yards Leave the next 5 fields empty if you use.

    Get Price
  • Bulk Carrier Safety

    Bulk carriers were developed in the 1950s to carry large quantities of non packed commodities such as grains coal and iron ore Some 5 000 bulk carriers trade around the world providing a crucial service to world commodities transportation Bulk carrier operators must be aware of the specific safety concerns related to this type of ship.

    Get Price
  • Bulk Excavations Construction Rates Prices Building labour

    2016 10 9 D20 BULK EXCAVATION AND FILLING RATES PER M2 M3 M Get a quoted rate from a contractor listed on Bulk.Excavation tradelocator products and services to buypress me for up to date prices buy our Live up date service where over 18 000 unit rates are up dated daily

    Get Price
  • PDF

    BULK MATERIAL DENSITY TABLE

    2018 3 22 BULK MATERIAL DENSITY TABLE Material Description Loose Bulk Density #/Ft Cork Fine Ground 12 15 Cork Granulated 12 15 Corn Cracked 45 50 Corn Cobs Ground 17 Corn Cobs Whole 12 15 Corn Ear 56 Corn Germs 21 Corn Grits 40 45 Corn Oil Cake 25 Corn Seed 45 Corn Shelled 45 Corn Sugar 30 35 Cornmeal 38 40 Cottonseed Cake Crushed 40 45

    Get Price
  • How do you calculate loose cubic yards

    2020 2 25 Topsoil Prices Per Cubic Yard Bulk topsoil costs between 12 and 55 per cubic yard including delivery Exact rates can depend on moisture content type of organic materials and geographic location Some mulch yards sell topsoil for 6 to 20 per scoop depending on the amount and quality of

    Get Price
  • Soil and Rock

    2021 11 12 Soil and rock expansionor swellafter mining Soil or rock from the borrow expands when dropped on the lorry or the landfillor stockpiled One cubic from the borrow does not translate to one cubic dump Bulking or swell factors for some materials Material Density at the Borrow.

    Get Price
  • Preventing collapse of bulk excavations

    The collapse of unsupported excavation walls puts workers and the public at risk of drowning if the excavation floods for example as a result of heavy rainfall or damaged pipes The collapse of excavation walls may damage buried utility services like gas or sewerage pipes and undermine the structural integrity of footpaths and road ways.

    Get Price
  • Construction

    2021 11 12 In the extreme conditions of construction and aggregate environments our full range of engine hydraulic compressor and bulk filters provides superior protection.

    Get Price
  • How to Figure Out Elevation Grade

    The process for measuring elevation as a percentage is the same as finding elevation change as a decimal with one extra step So find the rise over run In our example it’s 2 over 6 2/6 this is .33 Then simply multiply the decimal by 100 to find the percentage In this case 33 A positive percentage indicates an upward slope.

    Get Price
  • PDF

    CHAPTER 5 ESTIMATING WORK ITEMS COSTS IDIRECT

    2016 4 22 may occupy 0.9 cubic meter The soil to be excavated is called bank measure in its undisturbed condition prior to excavating or after being compacted in place Also any additional requirements to support the excavation operation should be also added to the cost estimating of an excavation operation For example excavation support dewatering

    Get Price
  • STANLEY FATMAX Tape Measure 25 Foot 33 725

    Stanley FMHT74038A FatMax 25 Foot Tape Measure 2PK 4.6 out of 5 stars 1 914 14 offers from 38.95 Amazon Basics Heavy Duty Tape Measure25 Feet 8 Meters Inch/Metric Scale 3 Lock Design MID Accuracy Chrome 2 Pack 4.5 out of 5 stars.

    Get Price
  • How to calculate and measure slope

    Convert the rise and run to the same units and then divide the rise by the run Multiply this number by 100 and you have the percentage slope For instance 3 rise divided by 36 run = .083 x 100 = an 8.3 slope Gaining a basic understanding of how to measure slope is important since you can then apply that knowledge to many other situations.

    Get Price
  • PDF

    6 Measurement and Earthwork Calculations

    2021 8 20 Measurement and Earthwork Calculations Cross Sections Volumes 6 1 CHAPTER SIX MEASUREMENTS AND EARTHWORK CALCULATIONS An important part of the discussion of earthwork is the determination of pay quantities In this section the following items are discussed 1 Contract quantity payment

    Get Price
  • PDF

    SUBSTRUCTURES GROUNDWORK D20 EXCAVATING

    2016 6 27 D20 EXCAVATING AND FILLING EXCAVATING To reduce levels A 1.00 m maximum depth 552 m3 Pits B 1.00 m maximum depth 115 m3 C 2.00 m maximum depth 11 m3 Trenches exceeding 300 wide D 1.00 m maximum depth 29 m3 Extra over excavation irrespective of depth for excavating E Soft spots removal and backfilling with Type 2 25 m3 granular material

    Get Price
  • Excavation Risk Assessment Free Templates

    2021 8 16 A Practical Guide on Excavation Risk Assessments The Occupational Safety and Health Administration states that excavating is recognized as one of the most hazardous construction operations.In some situations hazard potential increases especially after rainstorms and when fissures tension cracks and water seepage occur and the protection system design can be complex

    Get Price
  • PDF

    FUNDAMENTALS UNITS OF MEASUREMENT

    2016 4 13 FUNDAMENTALS UNITS OF MEASUREMENT Earthworks Estimating The Fundamentals Page 2 LCMLoose Cubic Metres BCMBank Cubic Metres CCM Compacted Cubic Metres LCM The best way to visualize LCM is to picture soil in the back of a truck or even better in the conical stockpile at the end of a stacker conveyor This is the idealized

    Get Price
  • PDF

    Chapter 2 Productivity of Construction Equipments

    2020 8 27 If desired the bucket load may be converted to bank volume by multiplying its loose volume by the soil‘s load factor Example 2.1 A 2.5cy front shovel is excavating a common earth Estimate the practical capacity of the bucket inbank measure if the load factor of the material is 0.85 Solution

    Get Price
  • PPT

    ESTIMATING EARTHWORK

    2015 11 13 Prof Awad S Hanna Job Efficiency Factors for Earthmoving Operations Prof Awad S Hanna Units of Measure Cubic Yard bank loose or compacted Prof Awad S Hanna 1.0 1.25 0.90 1.0 CUBIC YARD IN NATURAL CONDITION IN PLACE YARD 1.25 CUBIC YARD AFTER DIGGING LOOSE YARDS 0.90 CUBIC YARD AFTER COMPACTED COMPACTED YARDS In place

    Get Price
  • Excavation Material Removal Calculator

    Excavating soil and piling it up will loosen it and the volume will increase due to void spaces/air pockets added to the material If you are excavating an area with a volume of 200 cubic yards consisting of material with a 40 swell you are actually looking at removing 280 cubic yards bank volume of material that needs to be excavated in

    Get Price
  • Bank measure

    The World Bank measures global financial inclusion through its triennial Global Findex survey and while the GCC countries included in the latest survey featured relatively highly in terms of overall financial inclusion on some measures more work needs to be done.

    Get Price